Nov 14 Factory Visit

Back at Discovery Yachts again for this weeks visit. Now much of the deck gear and lockers have been installed, and the stainless steel fabrications are now arriving to be installed.  Down below cabin linings and ceilings are being fixed, before being removed once more for coverings to be applied.

Here’s a picture of the pullpit being installed, hopefully we’ll soon be sitting on those fold down seats watching dolphins!!

20181114_130823[1]

And here the first of the fore cabin blinds

20181114_101639[1]

Progress is fast now, and she’s looking great as the deadline for transport to the Dusseldorf boat show draws closer!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s