Nov 27 Factory Visit

20181127_120739

This weeks visit was very close to the previous weeks but since I had to be in the area, I popped to the factory anyhow. The deck is now pretty much ready for the synthetic decking to go on, here she is prepared, and with the coachroof grab rail in place.

20181127_120814

At the forepeak the Windlass has been installed, the access ladder for the sail locker is in with just the hatch to go

Down below she is coming together well, the hydraulics for the lifting keel have been installed, shown here in this photo while the hydraulic fluid is being topped up

20181127_121644

Still a lot to do, but they’re making great progress…

3 thoughts on “Nov 27 Factory Visit

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s